• SWF-2021-00360 (Grindstone Quarry)

    Expiration date: 8/5/2022

    The applicant proposes to utilize an undeveloped, 300-acre site as a quarry for aggregate production. The operation would require plant equipment, stockpiling of materials, and support facilities (e.g., office, equipment maintenance facility). Aggregate material would be extracted by using phased mining, which includes the removal of soil and rock above the desired layer of limestone, followed by removal of the exposed limestone. Aggregate material would be processed by using a crushing plant to produce the desired size and specification of material.
  • Draft Programmatic Agreement Regarding the Central City Portion of the Trinity River Vision Master Plan

    Expiration date: 7/29/2022

    The USACE is soliciting comments from all parties having an interest in the undertaking’s potential effect(s) on historic properties. Comments identifying historic cultural resource concerns within the area of potential effect (APE) or comments supporting, opposing, or identifying concerns with the documentation provided will be considered by the USACE.
  • Implementation of Two Temporary Low Water Crossings for the Central City Portion of the Trinity River Vision Master Plan

    Expiration date: 6/15/2022

    Clean Water Act Section 401 Water Quality Certification Request Regarding Two Temporary Low Water Crossings for the Central City Portion of the Trinity River Vision Master Plan.
  • SWF-2021-00174, Naaman School Road Improvements

    Expiration date: 6/16/2022

    View full public noticeThe U.S. Army Corps of Engineers, Fort Worth District (USACE) Regulatory
  • SWF-2020-00263 - Proposed Trinity Oaks Mitigation Bank

    Expiration date: 6/10/2022

    View full public noticeThis Public Notice is being issued to provide interested parties an