View full public notice
The applicant proposes to utilize an undeveloped, 300-acre site as a quarry for aggregate production. The operation would require plant equipment, stockpiling of materials, and support facilities (e.g., office, equipment maintenance facility). Aggregate material would be extracted by using phased mining, which includes the removal of soil and rock above the desired layer of limestone, followed by removal of the exposed limestone. Aggregate material would be processed by using a crushing plant to produce the desired size and specification of material.