Sam Rayburn Reservoir Master Plan Revision

Sam Rayburn LakeGeneral Information

The U.S. Army Corps of Engineers, Fort Worth District, is revising the Sam Rayburn Reservoir Master Plan. The Master Plan guides the management of the government lands around the edge of the reservoir. The Master Plan affects future management of natural resources and recreational opportunities to ensure the sustainability of Sam Rayburn Reservoir.

About Sam Rayburn Reservoir

Sam Rayburn Dam and Reservoir was authorized and constructed for the primary purposes of flood control, generation of hydroelectric power, and conservation of water for municipal, industrial and agricultural uses.  A major secondary use of project lands and waters is public water oriented recreation.  The reservoir area is heavily utilized through visitation from the major industrial areas of Beaumont, Port Arthur, Houston, Lufkin, and other large population centers.

 

Sam Rayburn Reservoir Facts about Sam Rayburn Reservoir:
  • Sam Rayburn Dam and Reservoir was dedicated on May 8, 1965
  • At conservation (normal) pool elevation (164.4 feet NGVD) the reservoir covers 114,500 acres
  • At the flood control pool elevation (173.0 feet NGVD) the reservoir covers 142,700 acres
  • The shoreline at top of conservation pool is over 750 miles long, 560 miles of which are managed by USACE and the remainder being U.S. Forest Service
  • 22,500 acres of land above conservation pool
  • 27,723 acres of flowage easement
  • Sam Rayburn is the largest reservoir completely within the borders of Texas
  • The reservoir ranks routinely in the Top 10 of bass fishing lakes in the nation

What is a Master Plan?

The Master Plan is the strategic land use management document that guides the comprehensive management and development of all project recreational, natural, and cultural resources throughout the life of the water resources project.

Why Revise the Sam Rayburn Reservoir Master Plan?

The current Master Plan is dated 9 December 1970 and it is in need of an update.  Much has changed since the original master plan was prepared including expansion of residential development resulting in population growth in the surrounding area.  Population growth and other factors all affect the management of the Federal lands at Sam Rayburn Reservoir and necessitates a need for an updated Master Plan.

The Master Plan Process

Related Files

January 31 and February 2 2017 Public Meetings

April 28, 29 2015 Public Meeting