View full public notice
The Ecosystem Restoration (ER) feasibility study will develop and analyze ecosystem restoration alternatives, including the No Action Alternative, to restore degraded ecological structure and function to aquatic and riparian habitat on the River Road reach of the San Antonio River between East Mulberry Avenue and US 281.