Today, the U.S. Army Corps of Engineers, Fort Worth District, awarded an architect-engineer contract to Black and Veatch-GEI Joint Venture, totaling $4.5 million, to update the conceptual designs and perform the necessary physical and hydraulic modeling for three flood gates and one pump station in support of the Modified Central City Project. The flood gates will be closed during large system events to divert flood waters through the bypass channel.