Milestone Achievement for Dallas Floodway Project: Providing Flood Risk Management to Communities
From the vantage point of the Dallas levee access road, Aaron Philips, USACE Construction Project Coordinator, right, overlooks 277k levee construction area with a with a construction company representative during final inspection.

Download Image: Full Size (1.77 MB)
Photo by: Pat Adelmann |  VIRIN: 230803-A-QV643-001.JPG