Fort Worth Drill Crew along the Trinity River
Driller Chris Bean waits to receive pipping while Lead Driller Dallas Spencer operates the controls in June while conducting soil borings along the Trinity River near downtown Fort Worth. The Fort Worth District Geotechnical Branch and in-house drill crew conducted supplemental site investigation along the south bypass channel alignment for the Modified Central City Project.